Not every spare part has to be in your own store, but some do. A simple assessment shows which parts prevent downtime and which can be sourced when needed.

Three questions per part
First: what happens if the part fails? If the whole line stops, the part is more critical than on a plant with redundancy. Second: how long does replacement take? Long lead times favour a stock. Third: how often does the part fail in practice?
Parts with a high failure impact and long replacement time belong in stock. Parts with a low impact and short sourcing time do not. For the range in between, framework agreements or a shared stock for identical parts in several machines help.
How to prepare a stocking request
- list of critical parts with type and maker
- number of installed parts and desired stock quantity
- group identical parts across several machines
- consider shelf life, for example of elastomers and batteries
- delivery date or call-off in partial quantities
Read more
Similar requirement?
Send us your parts list, a nameplate or a drawing. We check the sourcing and get back to you.
